Wisconsin DOT Additional Special Provision 6 for November 2023 Letting

10/10/2023

As standard specification changes come up that need fast-track implementation, WI DOT will insert them into contracts via additional special provision 6 (ASP 6). ASP 6 is included with the other ASP's in each contract proposal immediately after the special provisions. ASP 6 is inserted into all contracts by central office. Designers do not have to ask for it in their design letter.

The standard specifications is published annually and uses ASP 6 to supplement those specifications. ASP 6 will accumulate technical spec changes as they become necessary, each edition incorporating the previous edition, until they can be included in the standard specifications. The November ASP 6 release contains all previously issued revisions not incorporated into the annual standard specifications.

Department staff, contractors, and consultants must read the ASP 6 to avoid missing important specification changes. This email is a heads up to look at ASP 6 for each contract along with the other special provisions for technical spec changes.

The current version of ASP 6 is available online on the department's Highway Construction Contract Information (HCCI) website at:  https://wisconsindot.gov/hcciDocs/contracting-info/asp-6.pdf

The latest iteration of ASP 6 goes into effect with the November 2023 letting.

Provisions added effective with the November 2023 Letting:

108.9.4.1  Winter Suspension for Completion Date Contracts

108.9.4.1  Add subsection for winter suspension for completion date contracts.

310.2  Open-Graded Base Materials

310.2  Revise paragraph (2) to add coarse aggregate gradation table previously found in 501.

390.4  Measurement (Base Patching)

390.4  Add information for removing pavement for base patching measured by the CY, change to measure base patch asphaltic bid item by the ton only, add base patching concrete HES measured by CY, and edit to measure base patching concrete SHES by the CY.

390.5  Payment (Base Patching)

390.5  Revise to add bid item for removing pavement for base patching, remove the bid item for base patching asphaltic by the SY and retain the bid item by the ton, add bid item for base patching concrete HES, and revise bid item for base patching concrete SHES.

460.2.8.2.1.3.1  Contracts with 5000 Tons of Mixture or Greater

460.2.8.2.1.3.1  Add two bullet points to paragraph (4) asphalt content (AC) in percent regarding testing methods when the department is using or not using an ignition oven to determine AC content.

460.2.8.3.1.4  Department Verification Testing Requirements

460.2.8.3.1.4  Add to the last item of paragraph (3) the Wisconsin Test Procedure test reference if using ignition oven to determine AC.

503.2.2  Concrete (Prestresses Concrete Members)

503.2.2  Add the last sentence to paragraph (5) regarding to use only coarse aggregate conforming to 310.2(2).

604.2  Materials (Slope Paving)

604.2  Revise paragraph (3) to add coarse aggregate gradation table previously referenced as coarse concrete aggregate No.2 in 501.

612.3.9  Trench Underdrains

612.3.9  Revise paragraph (1) to add reference to coarse aggregate gradation table found in 604.2.

614.2.6  Sand Barrel Arrays

614.2.6  Revise paragraph (1) to add fine aggregate gradation table previously found in 501.

628.2.13  Rock Bags

628.2.13  Revise paragraph (2) to add reference for coarse aggregate gradation previously found in 501.

639.2.1  General (Drilling Wells)

639.2.1  Revise paragraph (2) to add reference for fine aggregate gradation previously found in 501.

652.3.1.2  Installing Underground

652.3.1.2  Revise paragraph (2) to add reference for coarse aggregate gradation previously found in 501.

ERRATA

390.3.4  Special High Early Strength Concrete Patching

Correct errata by revising link in paragraph (1) from 416.3.8 to 416.3.7.